03 TECHNOLOGY

We used the BIM model to generate a 3D walkthrough video of the space. This helped the client and trades visualize the space and coordinate everything from design to construction documents.

05 COVID AND FUTURE PROOFING

Starting the project at the beginning of the pandemic came with its own challenges. But it also provided the opportunity to reconsider the working environment under these unforeseen circumstances. We navigated the client through several options, landing on a grid-work of flexible enclosed spaces with modular walls to further future-proof their layout.